CDI was the prime consultant for the creation of the new Sully Butte Athletic Complex. Our design services included the creation of conceptual drawings and preliminary layouts, presentation to the Board of Education, and all design and construction administration. This project included: an 8-lane running track, high jump pad, long jump and triple jump pits, and surrounding chain link fencing. Site drainage was installed as a series of 12” drain basins connected via 8” HDPE piping following the inside perimeter of the paved track. The storm sewer drains northwest of the site. CDI worked with the school district to place construction times in the off-season or during weeks of away football games if needed. Construction began in the spring of 2016 and was completed in the fall of 2016.

Project Facts


Client:
Agar-Blunt-Onida School District

Location
Onida, South Dakota

Cost
$557,000