Elkton Athletic ComplexElkton 01_600x400.jpg

Elkton Athletic Complex

CDI was the prime consultant for the creation of the new Elkton Athletic Complex. Our services provided the creation of conceptual drawings and preliminary layouts, presentation to the Board of Education, and all design and construction administration. This project included: a football field, 8-lane running track, pole vault pad, high jump pad, long jump and triple jump pits, 500-seat grandstand, sports lighting and a parking lot. In order to fit with the budget, CDI planned a two-phase schedule to break expenses over two fiscal years.

 

Phase 1 construction began in May 2010 and was completed in October 2010.  Phase 1 included: all site grading, base course and asphalt on track and high jump pad, reinforced concrete flatwork on the long jump, triple jump, pole vault, shot put and discus field events; installation of storm sewer, sanitary sewer, waterline, chain-link fence and irrigation system. CDI provided all final design drawings and specifications, performed all construction administration and inspection, and construction staking.

 

Phase 2 includes the installation of the sports lighting structures, grandstand and track surfacing, and was constructed during the summer. The Elkton Athletic Complex was completed in the fall 2011.


Project Facts


Client:
Elkton Public School

Location
Elkton, SD

Cost
$755,000